DEMONSTRATION PROTOTYPE — ALL POOLED ORDERS, QUANTITIES AND DATES ARE SAMPLE DATA

Round welded mechanical tubing1.500 in OD × 0.059 in wall × 20 ft

ASTM A513 Type 2 · B22 · Cold Rolled Boron 15B22 · Ontario, Canada
Demand gatheringSAMPLE ORDER

Pool progress

FOUNDING POOL — GATHERING INTEREST
0 / 45,600 FT0.0/20.7 T0%
DEMAND GATHERING — NO COMMITMENTS YET · BE A FOUNDING BUYER
ORDER CUTOFF
Sep 11, 2026
MILL PRODUCTION WINDOW
Scheduled after cutoff
EST. AVAILABILITY
Estimated after the pool closes
DELIVERY REGION
Ontario, Canada
GTA · Golden Horseshoe · SW Ontario
COMMERCIAL STATUS
  1. DEMAND GATHERING← CURRENT
  2. POOL FORMING
  3. INTEREST THRESHOLD REACHED
  4. PRICING CONFIRMATION
  5. FIRM POS — BINDING
  6. ORDERED AT MILL
  7. IN PRODUCTION
  8. READY FOR ALLOCATION
  9. CLOSED

Stages advance on real events — cutoffs, confirmed pricing, firm POs and mill schedules. There are no countdown timers here.

Normalized specification

SHAPERound
SIZE1.500 in
WALL0.059 in
NOMINAL WEIGHT0.91 lb/ft · full run ≈ 20.7 tons
LENGTH20 ft
GRADEB22 · Cold Rolled Boron 15B22
STANDARD & TYPEASTM A513 Type 2
SURFACE / FINISHCR bare · light rust-preventive oil
WELD FLASHOD flash removed · ID flash-in
PACKAGINGHex bundles · 19 pcs · 380 ft per bundle
CERTIFICATIONMill test reports per heat · EN 10204 3.1 (subject to mill confirmation)
1.500 in OD
WALL 0.059 in · NOT TO SCALE

Commercial terms

Pricing. Indicative while the pool forms. Once the interest threshold is reached, supplier pricing is confirmed and presented to every buyer for approval.
Freight. Quoted separately at allocation, based on your postal code and bundle count. Never blended into the material price.
Commitments. Expressing interest is non-binding. You become bound when you approve confirmed pricing and issue a firm PO — once the consolidated mill order is placed, commitments are non-cancellable.
Certification. Mill test reports per heat · EN 10204 3.1 (subject to mill confirmation).

Important limitations

  • Full-length, full-bundle quantities only — no cutting or processing.
  • Planned lead times on the mill's schedule. Not suitable for emergency requirements.
  • Delivery within the Ontario, Canada region only for this pool.
  • Specification changes after commitment restart technical review.
  • Availability dates are estimates until the mill confirms its schedule.

Related technical resources

Understanding ASTM A513 Type 2 tubingGUIDE · SAMPLE
Wall-thickness tolerances for welded tubeGUIDE · SAMPLE
What a mill test report (MTR) containsGUIDE · SAMPLE
Bundling and freight on pooled ordersGUIDE · SAMPLE