DEMONSTRATION PROTOTYPE — ALL POOLED ORDERS, QUANTITIES AND DATES ARE SAMPLE DATA

Round welded mechanical tubing0.875 in OD × 0.051 in wall × 20 ft

ASTM A513 Type 2 · D60 · Cold Rolled Dual-Phase 600 · Ontario, Canada
In productionSAMPLE ORDER

Pool progress

9 BUYERS IN POOL
44,400 / 44,400 FT10.0/10.0 T100%
POOL CLOSED TO NEW COMMITMENTS
ORDER CUTOFF
Closed May 29, 2026
MILL PRODUCTION WINDOW
Jul 13–24, 2026 (current)
EST. AVAILABILITY
Week of Jul 27, 2026 (est.)
DELIVERY REGION
Ontario, Canada
GTA · Golden Horseshoe · SW Ontario
COMMERCIAL STATUS
  1. DEMAND GATHERING
  2. POOL FORMING
  3. INTEREST THRESHOLD REACHED
  4. PRICING CONFIRMATION
  5. FIRM POS — BINDING
  6. ORDERED AT MILL
  7. IN PRODUCTION← CURRENT
  8. READY FOR ALLOCATION
  9. CLOSED

Stages advance on real events — cutoffs, confirmed pricing, firm POs and mill schedules. There are no countdown timers here.

Normalized specification

SHAPERound
SIZE0.875 in
WALL0.051 in
NOMINAL WEIGHT0.45 lb/ft · full run ≈ 10.0 tons
LENGTH20 ft
GRADED60 · Cold Rolled Dual-Phase 600
STANDARD & TYPEASTM A513 Type 2
SURFACE / FINISHCR bare · light rust-preventive oil
WELD FLASHOD flash removed · ID flash-in
PACKAGINGHex bundles · 37 pcs · 740 ft per bundle
CERTIFICATIONMill test reports per heat · EN 10204 3.1 (subject to mill confirmation)
0.875 in OD
WALL 0.051 in · NOT TO SCALE

Commercial terms

Pricing. Indicative while the pool forms. Once the interest threshold is reached, supplier pricing is confirmed and presented to every buyer for approval.
Freight. Quoted separately at allocation, based on your postal code and bundle count. Never blended into the material price.
Commitments. Expressing interest is non-binding. You become bound when you approve confirmed pricing and issue a firm PO — once the consolidated mill order is placed, commitments are non-cancellable.
Certification. Mill test reports per heat · EN 10204 3.1 (subject to mill confirmation).

Important limitations

  • Full-length, full-bundle quantities only — no cutting or processing.
  • Planned lead times on the mill's schedule. Not suitable for emergency requirements.
  • Delivery within the Ontario, Canada region only for this pool.
  • Specification changes after commitment restart technical review.
  • Availability dates are estimates until the mill confirms its schedule.

Related technical resources

Understanding ASTM A513 Type 2 tubingGUIDE · SAMPLE
Wall-thickness tolerances for welded tubeGUIDE · SAMPLE
What a mill test report (MTR) containsGUIDE · SAMPLE
Bundling and freight on pooled ordersGUIDE · SAMPLE